Year-End Working Review 2017 of Ministry of Railways
Host of Passenger Amenities and Digital Initiatives were taken during the year 2017
All-time record commissioning of Electric Traction of 2367 route kilometer was achieved
During 2016-17 consequential train accidents decreased from 107 to 104 in comparison of the previous year
Track Renewal speeded up- 2148 km old rails have been replaced with new rails up to Nov’17
Ground-breaking ceremony of the Mumbai-Ahmedabad High-Speed Rail Project in September 2017
Introduced First AC EMU with ‘Indigenous’ Propulsion system of BHEL on Mumbai Suburban Section
Mission Retro-Fitment to revamp passenger coaches launched to enhance the passenger experience
14 Rajdhanis/15 Shatabdi trains were identified to significantly improve passengers experience under ‘Project Swarn’
Introduced and proliferated GPS based ‘Fog Pass device’ which displays the name and distance of approaching signals in advance during train operation
In order to improve the functioning of Railways, substantial financial and administrative powers have been delegated by the Railway Board to GMs/DRMs and field officials
PASSENGER AMENITIES, SERVICES
* From 03rd Nov. 2017, Service started to provide information to passengers through Short Messaging Service (SMS) regarding the status of delayed trains. Initially, all Rajdhani, Shatabdi, Tejas & Gatiman Trains covered. From 15th December 2017, all Jan Shatabdi, Duranto, and Garib Rath trains have also been included. Now, this service is available in around 250 trains.
* Permitted m-Aadhar as one of the prescribed proofs of Identity for Rail Travel Purpose.
* Extension of Scheme of Alternate Train Accommodation System aka VIKALP for the benefit of Waitlisted Passengers with effect from 1st April 2017 in all Mail/Express trains.
* Initiatives for The Senior Citizens -Persons With Disabilities: Indian Railways launched Quota of 2 Berths for Divyangjans & Senior Citizens in AC 3 class. This is in addition to the existing quota of 4 berths in SL class.
* Online booking of Retiring Rooms has been commissioned at 497 railway stations of Indian Railways. With a view to ensuring optimal utilization of available accommodation in Retiring Rooms and Dormitory, instructions have been issued to Western Railway for booking of Retiring Room as well as a dormitory for a minimum duration of 3 hrs except for night booking where the booking will be done mandatorily from 2100 hrs to 0900 hrs. This facility is presently available at Mumbai, Ahmedabad, Vadodara and Surat stations.
* New Catering Policy in Railways launched. 33% Sub Quota for Women in Allotment of each Category of minor Catering Units at All Category of stations has been provided under this policy. Roped in Self Help Groups To Make Local Cuisines Available Through E-Catering Services of its PSU IRCTC.
* Initiated programme for 100% LED lighting at stations leading to improved illumination and passenger safety. Completed more than 3500 stations so far with a target to cover all Railway stations by March 2018.
– Provision of mobile/laptop charging points at all railway platforms.
– Provision of insect catchers at railway stations.
– A new mobile app IRCTC Rail Connect launched. Aadhar linked user IDs have been allowed to book 12 e-tickets in one month as against 6 tickets for non Aadhar user IDs.
– A new Integrated Mobile App ‘Rail SAARTHI’ launched which provides various services viz. Rail e-ticket booking, unreserved ticketing, complaint management, Clean my Coach, passenger inquiry etc.
– Payment of ticket using UPI/BHIM App has been implemented at reservation counters as well as on e-ticketing website.
– Project Swarn – 14 Rajdhanis and 15 Shatabdi trains were identified to significantly improve passengers experience under ‘Project Swarn’. To achieve the objectives of this Project, ‘staff behavior’ was identified as an important parameter. The frontline staff of these premier trains was trained in various aspects such as catering, linen management, and cleanliness.
HIGH SPEED RAILWAY/MOBILITY
* A roadmap developed to increase speed of trains by overcoming the existing impediments on Principal routes of the railways on Golden Quadrilateral(GQ) along with diagonals (Delhi – Mumbai, Delhi – Howrah, Howrah- Chennai, Chennai – Mumbai, Delhi – Chennai and Howrah – Mumbai) due to fixed infrastructure, movable infrastructure, and operational practices.
* Projects for two routes viz. New Delhi- Mumbai Central (including Vadodara- Ahmedabad) and New Delhi- Howrah (including Kanpur- Lucknow) for raising of speed to 160/200kmph have been included in WP 2017-18 at Rs. 18,000 crores approximately. Speed Enhancement project entails works such as through fencing, removal of level crossings, train protection warning system (TPWS), mobile train radio communication (MTRC), automated and mechanized diagnostic systems etc. which will considerably enhance safety and reliability. The main outcome of the implementation of the projects is increasing in the maximum speed of the trains to 160/200 kmph. This will reduce the travel time of premium Rajdhani type trains to 12 hours as against the present travel time of 17 hours for Howrah Rajdhani and 15 hours 35 minutes for Mumbai Rajdhani.
* Replacement of loco hauled commuter trains with MEMU/DEMU trains: MEMU trains have a potential for average speed increment of up to 20kmph in comparison to loco driven passenger trains.
* Ground-breaking ceremony of the Mumbai-Ahmedabad High-Speed Rail Project (MAHSR) by Hon’ble Prime Minister of India and Hon’ble Prime Minister of Japan was held in September 2017. Managing Director and other Directors in the National High-Speed Rail Corporation Limited (NHSRCL), constituted for implementation of the MAHSR project, have been appointed.
Following Semi High-Speed Studies are underway:
o Delhi-Chandigarh (244 km): Final report of feasibility cum implementation study of New Delhi-Chandigarh Corridor for raising the speed of passenger trains to 200 kmph by SNCF/France has been received. A report under scrutiny.
o Nagpur-Secunderabad (575 km): A Protocol under co-operation MoU has been signed between Ministry of Railways and Russian Railways for carrying out feasibility cum implementation study. Work started in June 2016 and progressing as per schedule.
o Chennai-Kazipet by German Railways- Joint declaration of intent has been signed between both the parties on 10/10/17 for raising the speed of passenger trains to 200kmph on the existing route on 50:50 cost-sharing basis. The feasibility study shall be carried out after signing a separate agreement, which is under finalization.
o Feasibility study for High-Speed Rail on Mysuru-Bengaluru-Chennai through Government to Government (G2G) with the Government of Germany has commenced.
SAFETY
* During 2016-17 consequential train accidents decreased from 107 to 104 in comparison to the corresponding period of the previous year. In the current year from 1st April 2017 to 30th November 2017 consequential train accidents decreased from 85 to 49 in comparison to the corresponding period of the previous year.
* During the year from January to December 2017 to give thrust to safety-related issues, Safety drives were launched on all zonal railways with a view to preventing accidents.
* Emphasis on night inspections and ambush checks regularly by officers and supervisors, review of fracture prone locations, frequent and intensive footplate inspection, etc.
* Focus on monitoring practices associated with booking, counseling, training, PME, performance evaluation etc. of the crew in view of SPAD by Loco Pilots.
* A special safety drive regarding – ‘Working on running lines’ and ‘Safety at work sites’ for a period of fifteen days to check incidences of uncoupling in passenger train (Locomotive Getting Separated from Formation).
* Gate Mitras were deployed at all unmanned level crossings (UMLCs) on Broad Gauge instead of only identified UMLCs in order to enhance safety.
* Under Rashtriya Rail Sanraksha Kosh (RRSK) a provision of Rs. 20,000 crores have been made in 2017-18 out of ‘RRSK’ to fund essential works for ensuring safety.
High-Level Safety Review Committee (HLSRC):
A High-Level Safety Review Committee under the Chairmanship of Dr. Anil Kakodkar, former Chairman, Atomic Energy Commission was constituted on 16.09.2011 to go into all technical and technology related aspects in connection with the safe running of train services in the country. The Committee submitted its Report on 17.02.2012. All the 106 recommendations of the Committee have since been deliberated upon and 87 recommendations have been found fully/partially acceptable and 19 have not been found acceptable to the Ministry of Railways.
* Of the accepted recommendations, 65 have been fully/partially implemented. The remaining recommendations are at various stages of implementation.
* Target of Eliminating All Unmanned Level Crossing preponed to 2018. Until the time this is achieved, in the interim period, Indian Railways decided to deploy Gate Mitras. Gate Mitra is an initiative where a person will be deployed at a UMLC and would alert road users about approaching trains. All UMLCs on Broad Gauge as on November 2017 were provided with Gate Mitras.
* Track Renewal speeded up: 2148 km old rails have been replaced with new rails up to Nov’17.Progress during the corresponding period last year was 1624 km between April to Nov’16.
* Self-Propelled Ultrasonic Rail Testing (SPURTZ Car) is under procurement and trial of Ultrasonic Broken Rail Detection System is underway. Train Protection and Warning System (TPWS) is under implementation on Suburban/High- density Routes.
* Decided to switch over to 100 % manufacture of Linke Hofmann Busch (LHB) coaches as these have numerous advantages over ICF coaches including higher speed and safety especially during derailment and collisions. Completely switch over to LHB coaches production from 2018-19.
SYSTEM IMPROVEMENT AND INNOVATION
1. Comprehensively revised categories of various Railway Stations. In the new scheme of station categorization, even the small stations, because of footfall criteria, to get the higher level of passenger amenities leading to better passenger satisfaction.
2. Introduced and proliferated Global Positioning System (GPS) based ‘Fog Pass device’ which displays the name and distance of approaching signals and other critical signal landmarks in advance during train operation. At present total 7263 Fog Pass Devices have been procured and being used in NR, NER, NCR, ECR, NFR& NWR which are the most fog affected Railways.
Major Transparency measures by RDSO:
a) ‘New Online Vendor Registration System’ has been launched by RDSO with effect from 8th Nov 2017- With the new online system implemented by RDSO since 8th Nov 2017, the Vendor can now deposit registration fee, submit documents, download technical drawings & specifications and interact with RDSO online.
b) All RDSO controlled items have now been listed on RDSO website with specific timelines for Vendor Registration process for each individual item. RDSO will endeavor to complete the registration process for which the vendor applies within defined timelines.
c) Innovation Challenge: An Innovation Challenge has been conducted to invite ideas and to augment the pace of Indian Railways operational improvements through innovative methods. Innovation Challenges attracted a huge response and a total of 4683 entries were received. RDSO has been entrusted the task of conducting the screening and evaluation process. The Innovation Challenge has been conducted in the following 06 areas:
(i) Accessibility to trains from low-level platforms
(ii) Increasing the capacity of coaches
(iii) Digital capabilities at stations.
(iv) Design of Wagons for efficient loading and transportation of new commodities.
(v) New Idea/ Suggestion to improve the working of Indian Railways.
(vi) Increasing Non-fare revenue of Indian Railways.
TRANSPARENCY
* Online Tracking of Contractor’s Bill enabled on a single website – IT-enabled real-time Web-based system has been developed for tracking bill payments. This system enables the registered vendor/contractor to track the status of bills from the time they are submitted to the Railways till the final payment is made.
* Implementation of 100% Digitization of Receipt Note.
* Digital finalization of tenders – Total 54700 tender cases finalized this year digitally through Indian Railway E-Procurement portal www.ireps.gov.in
* More than 1000 e-Reverse Auction tenders opened on Indian Railways web portal during last 1 year.
NEW TRAINS
1. India’s First Tejas Express Between Mumbai and Karmali inaugurated.
2. More Than Three-Decade Old Demand for an ‘Express’ Train for People of Kirandul in Dantewada District of Chhattisgarh fulfilled. Extended Train No. 08152 Visakhapatnam – Jagdalpur Up to Kirandul.
3. Prime Minister of India & Prime Minister of Bangladesh Jointly along with Chief Minister, West Bengal Flagged off New Cross-Border Train between India & Bangladesh, ‘Kolkata-Khulna Bandhan Express’ from Kolkata.
4. Introduced tri-weekly new Special Rajdhani between Delhi – Mumbai route from 16th October 2017.
5. Introduced First AC EMU consisting of 12-car (12 coaches) fitted with ‘Indigenous’ 3-phase Propulsion system of Ms. BHEL on Mumbai Suburban Section.
6. Introduced Third Mahamana Express to run between Varanasi and Vadodara on 22nd September 2017.
7. Vistadome Tourist Coach with glass walls launched at Vishakhapatnam to run between Visakhapatnam and Araku Valley. The Vistadome coach has features like glass roof, LED lights, rotatable seats, GPS based info system etc will offer to tourists to enjoy scenic beauty not only at the destination but also along the journey.
8. Introduced Train No.22165/22166 Bhopal-Singrauli Express (Bi-Weekly).
9. Introduced Train No 22167/22168 Singrauli-H. Nizamuddin Express(Weekly).
10. Introduced Train No 18109/18110 Jammu Tawi-Rourkela Express (Daily) Up to Sambalpur:
11. Introduced Train No 22913/22914 Bandra(T)-Patna Humsafar Express (Weekly).
12. Introduced Train No 22921/22922 Bandra(T)-Gorakhpur Antyodaya Express (Weekly).
13. Introduced Train No 22434/ 22433 Anand Vihar (T) To Ghazipur (Bi-weekly) via Kanpur, Allahabad:
14. Introduced New DEMU Service between Baiyappanahalli-Whitefield-Baiyappanahalli.
15. Introduced Train No 22163/64 Bhopal-Khajuraho Mahamana Intercity Express (Daily),
16. Introduced Train No 22833/34 Bhubaneswar- Krishnarajapuram Humsafar Express (Weekly).
17. Introduced Train No 17323/17324 Hubballi-Varanasi-Hubballi Express (Weekly).
18. Introduced Train No 17325/17326 Hubballi-Mysuru-Hubballi Express (Daily).
19. Introduced Train No 16791/16792 from Punalur to Palakkad.
20. Introduced Train No 22992/22991 Veraval-Bandra Terminus Super Fast Express.
21. Introduced Train No 22994/22993 Mahuva-Bandra Terminus Super Fast Express.
22. Introduced Train No 19030/19029 Mahuva-Bandra Terminus Super Fast Express.
23. Introduced Train No 58653/58654 Ranchi-Barkichanpi Passenger up to Tori.
24. Introduced Train No Train No 14715/14716 Sri Ganganagar-Tiruchirappalli Humsafar Express (Weekly) (via Krishnarajapuram, Pune, Ahmedabad) the fourth Humsafar clan of trains.
25. Introduced Train No Train No 22877/22878 Ernakulam-Howrah Antyodaya Express (Weekly) (via Salem, Katpadi, Visakhapatnam) first Antyodaya clan of trains.
26. Extended Train No. 19653/19654 Ajmer Ratlam Express Extended up to Indore.
27. Extended Frequency of Train No.22419/22420 Ghazipur City-Anand Vihar (T) Suhail Dev Express from tri-weekly to four days a week.
28. Extended Frequency of Train No.19041/19042 Bandra (T)-Ghazipur City Express (weekly to bi-weekly).
29. Extension of Train No.58429/58430/58431/58432 (Khurda Road- Bolagarh) passenger trains extended up to Nayagarh Town.
INFRASTRUCTURE
* The first Phase of the Station Redevelopment Program comprising 23 major Railway Stations of Indian Railways was launched.
* Mission Retro-Fitment to revamp passenger coaches launched to enhance the passenger experience. It will cover 45,000 Coaches.
* Significant Step has taken towards Providing Rail Connectivity for Chardham Pilgrimage in the State of Uttarakhand through the commencement of final location Survey.
* Record Commissioning of sections on Electric Traction: During the calendar year 2017, all-time record commissioning of Electric Traction of 2367 route kilometer was achieved. A target for electrification of 4,000 route kilometer has been set for achievement during the financial year 2017-18.
Major Strategic Decisions to speed up 100% Electrification work
a) For Rail Electrification projects, Provision of ‘Deemed approval’ has been made for various drawings/schematic/plan wherever approving authorities do not take the decision within specified timelines.
b) In future, doubling, new line and gauge conversion projects for the sections shall be simultaneously assessed with electrification.
c) To avoid multiplicity of agencies involved in the execution, it has been decided that -Henceforth, where electrification and doubling works have been sanctioned both works should be executed by the same agency.
d) It has been decided to go for large size contracts on EPC mode on the case to case basis, preferably adopting EPC (turnkey) based contracting system or large composite item rate contract in package size of 300/500/1000/1500RKMs.
Opening of Major Routes On Electric Traction:
During the calendar year 2017, commissioning of missing links have resulted in better linkages and seamless connectivity on following routes:
o Commissioning of Andal-Sitarampur section,
o Commissioning of Indore-Mhow section.
o Commissioning of Singapur Road – Lanjigarh-Titlagarh section
o Commissioning of Lapanga-Sambalpur section.
o Commissioning of Una Himachal-Amb Andura section.
o Commissioning of Lalitpur-Udaipura section.
o Commissioning of Walgaon-Narkher section.
o Commissioning of Manpur-Tilaiya-Bakhtiyarpur section.
o Commissioning of Ramanagaram-Mysore section.
* Energy Management: Dedicated transmission line network of railway-8000 Km network planned. Existing transmission line network from Dadri-Kanpur extended up to Allahabad. Work in progress for Allahabad-Mughalsarai transmission line network.
* Electric Locomotive Factory at Madhepura in Bihar (Make in India project)- the First phase of construction of factory has been completed. First prototype locomotive under assembly at the factory and expected to be rolled out by Feb.’18 as per timeline. Manufacturing of High Horse Power Freight locomotives (9000 hp) for hauling longer and heavier trains with improved mobility. Manufacturing of High Horse Power Passenger locomotives (9000 hp) for improving average speed of coaching trains in this Locomotive Factory at Madhepura.
Technological Interventions for Crew Comfort inside locomotives
(a) Water Closets in Locomotives
(b) Cab air conditioners
(c) Improved Cab Ergonomics and layout
* Distributed Power Wireless Control System (DPWCS) for hauling longer and heavier freight trains with two or more locos in between train configuration.
* Technological Interventions for Safety – Crew Voice and Video recording system.
* New Era of Green Technology (HOG power supply) with use of Hotel load converter on electric locomotives in WAP-7 locomotives and in WAP-5 locomotives. Provision of Hotel load converter on locomotives, eliminates the use of diesel generator cars, thereby replacing power cars by passenger carrying coaches.
DIGITAL INDIA INITIATIVES
* For incentivizing people to opt digital transactions, IR has withdrawn service charge from booking of e-tickets, offered free insurance of Rs 10 lakhs on e-tickets and 0.5% discount on Season Tickets purchased through digital means etc.
* Around 9,500 POS machines have been installed at various ticket booking counters to accept payment from Debit/Credit cards. No MDR is a charge for booking through Debit cards at ticketing counters.
* The facility of payment through UPI/BHIM has been provided at PRS counters.
* Rail Cloud Project launched – To achieve the goal of a single digital platform for Indian Railways.
* Railsaver App developed and its utilization popularized with the railways.
* Implementation of e-office in the Railway Board.
* Implementation of online submission and assessment of Annual Performance Appraisal Report (APAR) through SPARROW for officers of Indian Railways.
* Digitization of old Annual Performance Appraisal Reports (APARs) of Group-A Officers of Indian Railways.
* Launching complimentary Wi-Fi facility at National Rail Museum (NRM), New Delhi, the first museum in India to have such facility.
* Agreement with M/s Google Cultural Institute (GCI) for digitization of Railway Heritage and bringing them online for universal access and creating awareness among future generations.
* In collaboration with Google Cultural Institute launched an innovative programme for the dissemination of India’s rich cultural heritage to railway passengers through video screens at Chhatrapati Shivaji Maharaj Terminus, Mumbai.
* In collaboration with ISRO, expediting the use of space technology on Indian Railways for various projects like Real Time Train Information System, Advance Warning System at Unmanned Level Crossing Gates.
* In order to promote digital payments, preference in Upgradation to those passengers who have booked a ticket through the digital mode of payment has been implemented.
FREIGHT
* Liberalised Automatic Freight Rebate Scheme in Empty flow Directions has been issued w.e.f.01.01.2017 by modifying earlier TEFD Scheme.
* Policy on Long-Term Tariff Contract with key freight customers has been issued on 30.3.2017. Total 24 proposals were received and out of them, 21 proposals/agreements have been signed. The major companies who have entered into contact with Zonal Railways under this scheme included TATA Steel, Ultra-tech Cement, India Cement, Jindal Steel and Power, J.K. Cement, Ambuja, ACC etc.
* Double stack dwarf container introduced as a new delivery model to increase Loadability and attract new traffic underwire. New tariff policy granting 17% rebate to Double Stack Dwarf Container trains has also been issued on 14.07.2017.
* Right Powering of freight trains: To provide high speed to freight trains and ensure swift movement of goods, a New policy introduced for right powering arrangement for freight trains with a horsepower to trailing load ratio of 1.5-2.0 for improving average speeds.
* New Partnership with India Post for Business Parcel launched.
* ‘Mission Hundred’ – Commissioning of PFTs/Sidings- 45 terminals have been commissioned during 2016-17. Out of the remaining 55 terminals, so far 13 terminals have been commissioned in 2017-2018.
FINANCE
* Inaugurated the following policy initiatives for non-fare revenue viz., Policy Initiatives of Increasing Non-Fare Revenue like Out of Home Advertisement, Content on demand, Branding of Trains, Non-fare Revenue Policy, ATM Policy, and Initiatives promoting ease of ticketing through digital transactions (for reserved as well as unreserved passengers)
* Savings of Rs. 512 Cr.(approx.) has been achieved since July’17 by adopting best procurement policies/practices like Design modification, change in specification, challenging consumption, Long Term Contracting, Reverse Auction, improving vendor base etc.
MAKE IN INDIA INITIATIVES
* Policy on Public Procurement (Preference to Make in India) dated 15-06-2017 implemented.
* Policy for providing Preference to Domestically Manufactured Iron & Steel Products (DMI&SP) implemented.
* Policy for preference to Domestically Manufactured Electronic Goods issued by The Ministry of Electronics and Information Technology (MeitY) in October 2017.
* Relaxation from the condition of prior turnover and prior experience for Startups and Medium Small Enterprises.
* Vendor meets organized on the PAN-India basis at 12 prominent locations across the country in association with MSME & SIDBI during October & November 2017 with special emphasis on the development of indigenous firms.
SECURITY
* Seats earmarked for Security Personnel of escorting teams in the trains. Berth no.63 in S1 Coach of the train earmarked for Security Personnel so they can be located easily in case of need.
* Railway Protection Force decided to extend Child Rescue Campaign in 47 additional Railway Stations taking total to 82 Railway Stations. The campaign had been successfully implemented in 35 existing Railway Stations. RPF rescued around 21,000 children in last three years.
GREEN INITIATIVES
* Dedicated Green Corridor in Bhagalpur- Banka section (Bihar) of Malda Division.
* Dedicated Green Corridor-Madhupur-Giridih section of Asansol Division.
* 500 Kwp Solar Roof Top System commissioned at Mysuru Work Shop.
* Indian Railways Organization for Alternate Fuel (IROAF) sets gold standards by winning Golden Peacock Award for Eco-Innovation for the year 2017 for introducing eco-friendly and cost saving Dual Fuel 1400 HP Diesel engines on DEMU trains.
* First DEMU Train with Solar powered Coaches inducted into service of the Nation.
* New Water Management Policy with respect to consumption and utilization in Railways was released.
* GreenCo Certificates developed by CII gave to Three Units of Indian Railways viz. Diesel Locomotive Works (Varanasi), Perambur Carriage
Works (Chennai), Lalaguda Carriage Workshop (Hyderabad)
* Various new initiatives taken for improving energy efficiency- Replacement of all electrical equipment at railway stations and service buildings with energy efficient BEE star rated equipment under ESCO model, 100% LED lighting at all the railway stations, service buildings, workshops, Sheds and other installations etc. With this, savings of Rs. 125 Cr. achieved this year by saving about 7% energy.
* Building Management Information System (BMIS) implemented at Rail Bhawan including LED lights which shall save about Rs.30 lacs per annum in the energy bill.
* Policy for use of energy-efficient equipment by all vendors issued to the railways.
* More than 60 MW of solar & wind power plants have already been installed covering 270 stations & 120 administrative buildings & hospitals and further orders for about 150 MW have been placed for solar plants on rooftops of Railway Buildings.
* An International Conference on Green Initiatives and Railway Electrification organized in October 2017.
HUMAN RESOURCE
* Project Saksham Launched: The decision of imparting a week-long training in skills and domain knowledge to all the employees of Indian Railways had been taken. The focus of all such training is to ‘make a difference’ to the job performance.
* Station Directors in large Stations have been now given the powers of the Branch Officers in the divisions to enable them to take decisions for smooth operations.
* Employee Charter was released. An employees’ charter is notified for ensuring time-bound redressal of railways employees’ issues related to dues, entitlements, and grievances.
* NIVARAN- Portal for Grievance Redressal of Railway Employees was launched.
* Cashless treatment Scheme in Emergency (CTSE) Scheme was launched for Railway Employees.
* DRMs/Chief Workshop Managers (CWMs) have been given powers to re-engage retired railway employees up to 62 years of age against vacancies.
* NRTU is being established at Vadodara, Gujrat to give impetus to research and training in rail transport.
REFORMS
* In order to improve the functioning of Railways, substantial financial and administrative powers covering a wide spectrum of working have been delegated by the Railway Board to General Managers (GM), Divisional Railway Managers (DRM) and field officials.
* Number of posts of Additional Divisional Railway Managers (ADRMs) in all the railway division offices for better supervision.
* A Five Member Committee of senior officials of Railway Board to suggest measures for making a substantial improvement in worksites safety over all Indian Railways network.
SPORTS
* Ministry of Railways felicitated Indian Railways Women Cricketers of Indian Women Cricket Team for their outstanding performance in Women World Cup 2017. It is a moment of great pride for Indian Railways that of the squad of 15 players of Indian Women Cricket Team, 10 Women Cricketers were from Indian Railways.
* Mirabai Chanu, Indian Railways Sportsperson, became the first Indian in over two decades to claim a gold medal at the World Weightlifting Championship in Anaheim, USA.
MOUs.
* MoU between India and Switzerland on Technical Cooperation in Rail Sector
* Memorandum of Understanding signed between Rail Land Development Authority(RLDA) & IRCON International Limited for Redevelopment of Delhi Safdarjung Railway Station.
* India and Italy Sign an MOU for Technical Cooperation in Rail Sector Especially on Safety-Related Subjects. MoU with Ferrovie Dello Stato Italiane S.P.A. of Italy on Technical Cooperation in the Rail Sector.
* Memorandum of Understanding (MoU) / Memorandum of cooperation (MoC) with Foreign Ministries/Railways for Technical Cooperation in Railway Sector.
* Memorandum of Understanding with UNESCO, New Delhi for preparation of Comprehensive Conservation Management Plan (CCMP) of Darjeeling Himalayan Railway (DHR), UNESCO World Heritage Site. This will boost conservation of DHR and promote hill railway tourism.
* MoU between Rail Land Development Authority (RLDA), an institution under Ministry of Railways and National Building Construction Corporation (NBCC), a PSU of Ministry of Urban Development regarding redevelopment of identified railway stations.
* MoU with Taiwan for bilateral cooperation in promoting rail heritage on both sides.
MISCELLANEOUS
* Century old Steam Loco EIR-21 (year built 1855) has been revived and steamed at Chennai.
* NG Steam Loco ZB-66 has been revived and steamed up at Kalka Shimla Section after a gap of several decades.
* Neki ki Rail – a seminar for improving the Railway’s social footprint and impacting society in a positive manner Organised by Ministry of Railways at National Rail Museum.
* Notification for setting up of Rail Development Authority (RDA) issued in May 2017. In order to operationalize the Authority, the process for appointment of Chairman and Members of the RDA has been initiated.
* Promotion of Tribal /local Art at Stations: To showcase tribal/local art at stations, select tourist stations at 24 locations were identified and Zonal Railways concerned were requested for aesthetic up gradation of these stations with local/tribal art.
* The ‘Fairy Queen’, the oldest surviving functional steam engine in the world commenced its journey from National Capital Delhi to Rewari, Haryana after a gap of 5 years. This train, which is a great attraction among steam engine lovers across the globe, will run between Delhi Cantt. Station and Rewari.
#Above report published as per data provided by Ministry of Railways.