{"id":2008,"date":"2021-02-03T12:33:18","date_gmt":"2021-02-03T07:03:18","guid":{"rendered":"http:\/\/railsamachar.com\/english\/?p=2008"},"modified":"2021-02-03T12:33:21","modified_gmt":"2021-02-03T07:03:21","slug":"how-the-plan-to-build-dfcs-became-an-escape-route","status":"publish","type":"post","link":"https:\/\/railsamachar.com\/english\/?p=2008","title":{"rendered":"How the plan to build DFCs became an escape route !"},"content":{"rendered":"<h4 style=\"text-align: justify;\"><strong><span style=\"color: #0000ff;\">Will the Railway Board bite the bullet and revise its plans?<\/span><\/strong><\/h4>\n<h4 style=\"text-align: justify;\"><em><span style=\"color: #333300;\"><strong>Instead of Ahmedabad-Mumbai Bullet Train line on Standard Gauge, Railway should have built a 200-250 kmph Conventional High-Speed line on Broad Gauge that would have been much cheaper and far more beneficial<\/strong><\/span><\/em><\/h4>\n<h5 style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Alok Kumar Verma, IRSE (Rtd.)<\/span><\/h5>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">How the plan to build Eastern and Western Dedicated Freight Corridors (DFCs) became an escape route to delay higher speed on the Indian Railway network.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">When the DFC project was announced, Railway Board said, &#8220;when DFC is built in 5 years, upgrade work for raising speed on Delhi-Howrah and Delhi-Mumbai lines will be started&#8221;.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">The original plan was to start upgrading these 2 vital routes in 1997-2002, but it was put on the back-burner. As time passed traffic reached saturation levels, making it difficult to undertake upgradation of track.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">As I have said instead of the DFCs, new 200-250 kmph lines should have been built.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Today the situation is that the DFCs won&#8217;t be completed in the next 5 years.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">So, the plan of upgrading the above 2 routes will be delayed by at least 15 years (2010-25).<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\"><strong>Another question arises:<\/strong> Why did Railway Board not start upgradation works on the other routes where congestion was not there in 2005?<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Even now there are many routes with no congestion where upgradation can be undertaken.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">China raised speed on its existing trunk routes between 1997-2007 in stages to 160 kmph, 180 kmph and finally 200 kmph.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">European and several other railways also did it in the same manner in the 1970s and 80s.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">The fact that India still does not have a single line with 200-250 kmph speeds shows that Railway Board is not serious about Raising Speed.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">In fact instead of Ahmedabad-Mumbai Bullet Train line (on Standard Gauge), Railway should have built a 200-250 kmph Conventional High-Speed line on Broad Gauge that would have been much cheaper and far more beneficial, except that it would take 3 hrs from Mumbai to Ahmedabad whereas the Bullet Train can do it in 2 hour 15 minutes.<\/span><\/p>\n<h4 style=\"text-align: justify;\"><span style=\"color: #993300;\"><strong>What can be done now:<\/strong><\/span><\/h4>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">1. First take a policy decision that no more Bullet Train lines and DFC lines for next 15 yrs.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">2. Upgrade existing lines, wherever feasible, and build new Conventional High Speed lines for 200-250 kmph.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">3. Convert ongoing Eastern and Western DFCs to normal mixed traffic lines. It is doable.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">This way we can build about 15,000 to 18,000 km Conventional High Speed lines to cover four ends of the country at an expenditure of about INR 6 lakh crore.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Now consider that at the current rate of INR 300 crore per km, that amount will be needed to build a line from Delhi to Chennai.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Will the Railway Board bite the bullet and revise its plans?<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Else, travel by car and airplanes will go on booming causing much harm by way of Climate change, diversion of land, air pollution in cities and congestion on the roads.<\/span><\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\">\n<p lang=\"en\" dir=\"ltr\">How the plan to build Eastern and Western DFCs became an escape route to delay higher speed on the Indian Railway network.<\/p>\n<p>When the DFC project was announced, Rly Board said when DFC is built in 5 yrs, upgradation work for raising speed on Delhi-Howrah and Delhi-Mumbai lines&#8230; <a href=\"https:\/\/t.co\/McxZNm1uyP\">https:\/\/t.co\/McxZNm1uyP<\/a> <a href=\"https:\/\/t.co\/8ONpo4IKMw\">pic.twitter.com\/8ONpo4IKMw<\/a><\/p>\n<p>&mdash; Trains Are Best, Alok Kumar Verma, IRSE (Retd) (@trains_are_best) <a href=\"https:\/\/twitter.com\/trains_are_best\/status\/1234011049411645443?ref_src=twsrc%5Etfw\">March 1, 2020<\/a><\/p><\/blockquote>\n<p><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Will the Railway Board bite the bullet and revise its plans? Instead of Ahmedabad-Mumbai Bullet&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2009,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"koo_publish_custom_meta":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-2008","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-main-story"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2021\/02\/DFC-Ately1.jpg?fit=750%2C437&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/2008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=2008"}],"version-history":[{"count":1,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/2008\/revisions"}],"predecessor-version":[{"id":2010,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/2008\/revisions\/2010"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/media\/2009"}],"wp:attachment":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=2008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=2008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=2008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}