{"id":1935,"date":"2020-12-05T03:12:34","date_gmt":"2020-12-04T21:42:34","guid":{"rendered":"http:\/\/railsamachar.com\/english\/?p=1935"},"modified":"2020-12-05T03:12:38","modified_gmt":"2020-12-04T21:42:38","slug":"repeated-failures-of-railway-board-to-raise-speed-on-the-existing-tracks","status":"publish","type":"post","link":"https:\/\/railsamachar.com\/english\/?p=1935","title":{"rendered":"Repeated failures of Railway Board to raise speed on the existing tracks"},"content":{"rendered":"<h4 style=\"text-align: justify;\"><strong><span style=\"color: #0000ff;\">It urgently needs faster travel for education, jobs, and\u00a0other socioeconomic needs.<\/span><\/strong><\/h4>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\"><span style=\"color: #993300;\"><strong>Alok Kumar Verma,<\/strong><\/span> IRSE (Rtd.)<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">The problem lies largely in the Railway Board, which failed to see in time, 1990s, that competition from road and air modes of transport is rapidly increasing and Indian Railways must raise speed and expand capacity to meet this challenge.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">But, in the past 20 years they repeatedly failed to start raising speed.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">For the Board, even 160 kmph became an insurmountable barrier.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">China built it&#8217;s first 200 kmph new line in 1998 and by 2010 it had raised speed on most trunk routes to 200 kmph.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Europe did that in the 1960s and 70s.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">China has done away with nearly all their non-AC trains. They are not a democracy, they can afford to.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">What can we do when less than 10% of our trains are fully AC, and a need as basic as AC treated as a luxury by Railway Board?<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">India has a large middle class. As the country develops this class will grow.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">It urgently needs faster travel for education, jobs, and\u00a0other socioeconomic needs.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">AC coaches are needed for speed &gt; 130 kmph. Journey time of these slower trains will reduce from higher line capacity.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">If we have to make a case to run trains at 160-200 km\/h, we&#8217;ll need-<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">A. dedicated track pairs<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">B. completely air-conditioned rakes capable of that high speed.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Surely that starts with quadrupling lines. That takes a lot of money, but the Board is not keen on spending.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">To fund that, perhaps, we can convert all Mail\/Express trains into non-AC, with only Unreserved and 2nd class\/Sleeper, and all Superfast into full-AC, no unreserved, 3AC at Express fares in place of Sleeper class..<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">When the latter category increase in number, we have a case for 4x lines.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Railway Board&#8217;s repeated failure to raise speed on the existing lines.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">#RailwayBoard #IndianRailways #railway #PiyushGoyal #RailMinIndia #HSR<\/span><\/p>\n<blockquote class=\"twitter-tweet\" data-width=\"550\" data-dnt=\"true\">\n<p lang=\"en\" dir=\"ltr\">The problem lies largely in Railway Board, which failed to see in time, 1990s, that competition from road and air modes of transport in rapidly increasing and IR must raise speed and expand capacity to meet this challenge. In the past 20 yrs they repeatedly failed to start&#8230; <a href=\"https:\/\/t.co\/lRX2c8pqdK\">https:\/\/t.co\/lRX2c8pqdK<\/a><\/p>\n<p>&mdash; Trains Are Best, Alok Kumar Verma, IRSE (Retd) (@trains_are_best) <a href=\"https:\/\/twitter.com\/trains_are_best\/status\/1333602337504382976?ref_src=twsrc%5Etfw\">December 1, 2020<\/a><\/p><\/blockquote>\n<p><script async src=\"https:\/\/platform.twitter.com\/widgets.js\" charset=\"utf-8\"><\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>It urgently needs faster travel for education, jobs, and\u00a0other socioeconomic needs. Alok Kumar Verma, IRSE&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1926,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"koo_publish_custom_meta":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-1935","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-main-story"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/11\/Trackman1.jpg?fit=1475%2C996&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1935","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1935"}],"version-history":[{"count":1,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1935\/revisions"}],"predecessor-version":[{"id":1936,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1935\/revisions\/1936"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/media\/1926"}],"wp:attachment":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1935"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1935"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1935"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}