{"id":1864,"date":"2020-10-16T02:52:02","date_gmt":"2020-10-15T21:22:02","guid":{"rendered":"http:\/\/railsamachar.com\/english\/?p=1864"},"modified":"2020-10-16T03:07:43","modified_gmt":"2020-10-15T21:37:43","slug":"collusion-amongst-cpm-rvnl-and-agm-wcr","status":"publish","type":"post","link":"https:\/\/railsamachar.com\/english\/?p=1864","title":{"rendered":"Collusion amongst CPM\/RVNL and AGM\/WCR"},"content":{"rendered":"<h4><a href=\"https:\/\/drive.google.com\/file\/d\/1DJ9d_1Hpghl8X005kPnFq_FAzx7C_10T\/view?usp=sharing\"><strong><span style=\"color: #0000ff;\">The first time in Indian Railways track will be laid right above the signalling cables courtesy one AGM of S&amp;T itself<\/span><\/strong><\/a><\/h4>\n<figure id=\"attachment_1866\" aria-describedby=\"caption-attachment-1866\" style=\"width: 213px\" class=\"wp-caption alignleft\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"wp-image-1866 size-medium\" src=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/BPL-WCR-Cable-surve-report.jpg?resize=213%2C300\" alt=\"\" width=\"213\" height=\"300\" srcset=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/BPL-WCR-Cable-surve-report.jpg?resize=213%2C300&amp;ssl=1 213w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/BPL-WCR-Cable-surve-report.jpg?w=350&amp;ssl=1 350w\" sizes=\"auto, (max-width: 213px) 100vw, 213px\" \/><figcaption id=\"caption-attachment-1866\" class=\"wp-caption-text\"><strong><span style=\"color: #000080;\">Cable surve report<\/span><\/strong><\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">CPM wants to lay a new track right over the route of existing cables, which is against the established standards.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">So that the SrDSTE and\u00a0PCSTE are obviously against it. They want first cables to be diverted and then laid down the\u00a0track.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">This CPM approaches AGM (incidentally who is also from S&amp;T cadre) seeking decision in favour of CPM or it can be said\u00a0in favour of RVNL else S&amp;T will become beyond control and create nuisance at all the place and working will become very difficult.<\/span><\/p>\n<figure id=\"attachment_1867\" aria-describedby=\"caption-attachment-1867\" style=\"width: 266px\" class=\"wp-caption alignright\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"wp-image-1867 size-large\" src=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/BPL-WCR-Msg-sent-by-CPM-RVNL-to-AGM.jpg?resize=266%2C1024\" alt=\"\" width=\"266\" height=\"1024\" srcset=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/BPL-WCR-Msg-sent-by-CPM-RVNL-to-AGM.jpg?resize=266%2C1024&amp;ssl=1 266w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/BPL-WCR-Msg-sent-by-CPM-RVNL-to-AGM.jpg?resize=78%2C300&amp;ssl=1 78w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/BPL-WCR-Msg-sent-by-CPM-RVNL-to-AGM.jpg?w=350&amp;ssl=1 350w\" sizes=\"auto, (max-width: 266px) 100vw, 266px\" \/><figcaption id=\"caption-attachment-1867\" class=\"wp-caption-text\"><span style=\"color: #000080;\"><em><strong>Messages sent by CPM RVNL to AGM\/WCR<\/strong><\/em><\/span><\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #0000ff;\">The S&amp;T department (SrDSTE and PCSTE) still object to this non standard working but AGM influences GM and gets objections of the S&amp;T department overruled.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Now the first time in Indian Railways track will be laid right above the signalling cables courtesy one AGM of S&amp;T itself.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #0000ff;\">AGM is actually working as a de facto PCSTE and hijacked the role of PCSTE.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">He doesn&#8217;t even respect senior and competent S&amp;T officers like CSE and CSTE\/Project.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Now it will be very interesting to see that Member (Infrastructure), Railway Board who himself is from the S&amp;T department and also in charge of RVNL, takes the side of established\u00a0norms or his righteous S&amp;T officers or arrogant and abusive CPM and AGM.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Utility shifting (all existing gears which infringe new line) is a regular practice in all doubling, tripling DFC projects.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">But this CPM didn&#8217;t plan cable shifting timely and now this failure on his part may delay the project commissioning by another 15 days, so he decides to bully Division and Zone with the support of AGM.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">The reason behind the unholy nexus between CPM and RVNL needs to be investigated.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">CPM and AGM like him who are arm twisting the Division and Zonal officers should be transferred at once.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">#rvnl #cpm #bhopaldivision #westcentralrailway #agm #agmwcr #srdste #pcste #dfc #dfccil #dfcprojects<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The first time in Indian Railways track will be laid right above the signalling cables&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1865,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"koo_publish_custom_meta":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-1864","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-main-story"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/BPL-WCR-Cable-route22.jpg?fit=800%2C730&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1864"}],"version-history":[{"count":2,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1864\/revisions"}],"predecessor-version":[{"id":1869,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1864\/revisions\/1869"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/media\/1865"}],"wp:attachment":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}