{"id":1833,"date":"2020-10-02T06:44:30","date_gmt":"2020-10-02T01:14:30","guid":{"rendered":"http:\/\/railsamachar.com\/english\/?p=1833"},"modified":"2020-10-02T06:44:31","modified_gmt":"2020-10-02T01:14:31","slug":"western-railway-installed-rooftop-solar-panels-at-75-stations","status":"publish","type":"post","link":"https:\/\/railsamachar.com\/english\/?p=1833","title":{"rendered":"Western Railway installed rooftop solar panels at 75 stations"},"content":{"rendered":"<h4><strong><span style=\"color: #0000ff;\">The Railway&#8217;s mission to achieve the goal of becoming \u201cNet Zero Carbon Emission Railway\u201d before 2030<\/span><\/strong><\/h4>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\"><strong>Mumbai :<\/strong> In order to achieve the objective of Indian Railways to become 100% self sustainable for all it&#8217;s power needs and also to contribute to national solar power goals, Western Railway has solarised its 75 stations till date.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">The use of solar power will accelerate the Railway&#8217;s mission to achieve the goal of becoming \u201cNet Zero Carbon Emission Railway\u201d before 2030.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">According to a press release issued by CPRO\/WR Sumit Thakur, suitable Rooftop Solar Panels have been installed at 75 stations over Western Railway.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">8.67 MWp capacity rooftop solar plants have been provided at various railway stations and office buildings.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">These plants have been commissioned and connected to the grid and as a result, a saving of Rs. 3 crore is accrued during the financial year.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Western Railway spokesperson informed that Solar Plants have been installed at 22 stations in Mumbai Division, 34 stations in Ratlam Division, 6 stations of Vadodara Division and 8 stations in Rajkot Division.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Similarly, in <strong>Ahmedabad Division,<\/strong> solar plants have been installed at Sabarmati &amp; Ambli Road stations as well as Ahmedabad station building whereas in Bhavnagar Division at Bhavnagar station and Somnath station building.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">In <strong>Mumbai Division,<\/strong> the rooftop Solar Plants have been installed at Churchgate, Grant Road, Matunga Road, Andheri, Mumbai Central, Lower Parel, Mahim, Khar Road, Santacruz, Ram Mandir, Malad, Kandivali, Borivali, Dahisar, Mira Road, Bhayander, Naigaon, Vasai Road, Nallasopara, Dahanu Road stations, while at\u00a0 Dadar as well as at Bandra Terminus, station buildings &amp; platforms.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">In <strong>Ratlam Division,<\/strong> rooftop Solar Plants have been installed at Chanderiya, Nimbahera, Gambhiri, Jawad Road, Mangliya Gaon, Ajnod, Lakshmibai Nagar, Ranyal, Jasmiya, Pipliya, Mandsaur, Nauganwan, Runija, Bangrod, Sehore, Kalapipla, Pachwan, Maksi, Vikramnagar station buildings, Indore, Ujjain, Dewas, Chittaurgadh, Meghnagar, Bajrangarh, Fatehabad, Gautampura, Dr. Ambedkar Nagar (Mhow), Nagda, Nimach, Jaora,\u00a0 Badnagar, Shujalpur, Kachrod stations and at Ratlam station building &amp; platforms.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">In <strong>Vadodara Division,<\/strong> the rooftop Solar Plants have been installed at Vadodara, Od, Makarpura, Varnarna, Sadhanpura station buildings and at Godhra staton building &amp; platforms.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">In Rajkot Division, the rooftop Solar Plants have been installed at Rajkot, Okha, Jamnagar, Chamaraj, Lakhamachi, Modpur, Lakhabawal and Pipli stations.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">It is worth mentioning that Indian Railways is set to produce solar energy for meeting all it&#8217;s energy consumption needs of more than 33 billion units by 2030.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Current annual requirement is about 20 billion units. Indian Railways has a mega plan for installing solar plants of 20 GW capacity by 2030 by utilizing its vacant land.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">About 51,000 hectares of vacant land is available with Indian Railways and is now ready to extend all support to the developers for installing solar power plants on Railway\u2019s vacant un-encroached land.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">It may be noted that Railways is also set to achieve 100% electrification by the year 2023 and is committed to utilize solar energy for meeting its traction power requirement and become a complete \u2018Green mode of transportation\u2019.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">This is in line with the recent directive of the Prime Minister to solarise railway stations and utilize vacant railway land for Renewable Energy (RE) projects.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">1#westernrailway #indianrailways #railway #solarsystem #staion #rooftopsolarpanel<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Railway&#8217;s mission to achieve the goal of becoming \u201cNet Zero Carbon Emission Railway\u201d before&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1834,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"koo_publish_custom_meta":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-1833","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-main-story"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/10\/WR-Solar-system.jpg?fit=800%2C492&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1833"}],"version-history":[{"count":1,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1833\/revisions"}],"predecessor-version":[{"id":1835,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1833\/revisions\/1835"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/media\/1834"}],"wp:attachment":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}