{"id":1656,"date":"2020-07-23T08:04:06","date_gmt":"2020-07-23T02:34:06","guid":{"rendered":"http:\/\/railsamachar.com\/english\/?p=1656"},"modified":"2020-07-23T08:04:09","modified_gmt":"2020-07-23T02:34:09","slug":"dhutra-bamra-3rd-line-in-ser-completed-and-ready-for-crs-inspection","status":"publish","type":"post","link":"https:\/\/railsamachar.com\/english\/?p=1656","title":{"rendered":"Dhutra-Bamra 3rd line in SER completed and ready for CRS inspection"},"content":{"rendered":"<figure id=\"attachment_1658\" aria-describedby=\"caption-attachment-1658\" style=\"width: 400px\" class=\"wp-caption alignleft\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1658\" src=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/07\/SER-Dhutra-line.jpg?resize=400%2C534\" alt=\"\" width=\"400\" height=\"534\" srcset=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/07\/SER-Dhutra-line.jpg?w=400&amp;ssl=1 400w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/07\/SER-Dhutra-line.jpg?resize=225%2C300&amp;ssl=1 225w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><figcaption id=\"caption-attachment-1658\" class=\"wp-caption-text\"><em><span style=\"color: #333300;\"><strong>Completion of Dhutra-Bamra 3rd line in Chakradharpur Division of South Eastern Railway.<\/strong><\/span><\/em><\/figcaption><\/figure>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\"><span style=\"color: #333300;\"><strong>Kolkata :<\/strong><\/span> The 3rd Line between Dhutra and Bamra (27.9 km) in Chakradharpur Division of South Eastern Railway has been completed and inspection by Commissioner of Railway Safety will be held on 25.07.2020.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">This is a part of the important 3rd Line project between Rourkela-Jharsuguda (101 km) on Howrah-Mumbai main line and was sanctioned in the year 2015-16.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">The present estimated cost is Rs.1312.93 crores. The 3rd Line between Dhutra-Bamra has been completed at a cost of Rs.362 crores.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">With the Howrah-Mumbai trunk route witnessing heavy growth of rail traffic, this 3rd Line project became essential.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">The existing main line has become fully saturated due to which operation of Passenger and Freight train services have become extremely difficult as well as complicated.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">With a view to provide additional line capacity, to ease congestion and for more mobility of freight and passenger train movement, this 3rd line project is being given high priority.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">The 27.9 km long Dhutra-Bamra 3rd Line work of Rourkela-Jharsuguda 3rd Line project (101 km) has been completed and the remaining\u00a073.1 km work is moving well in phased manner.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">The Commissioner of Railway Safety has programmed to conduct statutory inspection with a speed trial along with other safety related inspections on the newly constructed 3rd Line on 25.07.2020.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">After safety clearance, the section will be fit to run freight and passenger trains.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kolkata : The 3rd Line between Dhutra and Bamra (27.9 km) in Chakradharpur Division of&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1657,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"koo_publish_custom_meta":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-1656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-main-story"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/07\/SER-Dhutra-Bamra-3rd-line.jpg?fit=800%2C406&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1656","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1656"}],"version-history":[{"count":1,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1656\/revisions"}],"predecessor-version":[{"id":1659,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1656\/revisions\/1659"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/media\/1657"}],"wp:attachment":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}