{"id":1352,"date":"2020-03-18T02:22:17","date_gmt":"2020-03-17T20:52:17","guid":{"rendered":"http:\/\/railsamachar.com\/english\/?p=1352"},"modified":"2020-03-18T02:22:19","modified_gmt":"2020-03-17T20:52:19","slug":"rail-wheel-plant-bela-to-increase-manufacturing-capacity-by-more-than-50-from-fy20-21","status":"publish","type":"post","link":"https:\/\/railsamachar.com\/english\/?p=1352","title":{"rendered":"Rail Wheel Plant, Bela to increase manufacturing capacity by more than 50% From FY20-21"},"content":{"rendered":"<h4 style=\"text-align: justify;\"><strong><span style=\"color: #0000ff;\">Making a rapid stride, the modern Rail Wheel Plant at Bela, north Bihar has set an enhanced target of producing 53,000 wheels in 2020-21 from 35,000 from the last year<\/span><\/strong><\/h4>\n<p style=\"text-align: justify;\"><span style=\"color: #800000;\"><strong>Set up in the year 2012 at an estimated cost of nearly Rs 1500 crore,<\/strong> the #Bela plant has been manufacturing cast steel wheels for coaches and wagons. Though, it remains the younger sibling of the Rail Wheel Factory (#RWF), Bengaluru, it is now on a path of rapid growth and is fast becoming a major player.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">In December 2019, the plant situated in a remote and rural environment in North Bihar has manufactured 8057 wheels, an unparalleled result of planning and teamwork and a record meant to establish the capacity of the plant which was never established since its inception.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">The plant has an installed capacity of over 8000 wheels per month but never produced more than 3000 wheels on an average.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"wp-image-1355 size-thumbnail alignleft\" src=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/screenshot_20200306-191602__015353388195473620167.jpg?resize=150%2C150\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/screenshot_20200306-191602__015353388195473620167.jpg?resize=150%2C150&amp;ssl=1 150w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/screenshot_20200306-191602__015353388195473620167.jpg?zoom=2&amp;resize=150%2C150 300w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/screenshot_20200306-191602__015353388195473620167.jpg?zoom=3&amp;resize=150%2C150 450w\" sizes=\"auto, (max-width: 150px) 100vw, 150px\" \/>&#8220;We have done it without any additional manpower&#8221;, said <strong>#Shubhranshu,<\/strong> the Chief Administrative Officer (#CAO) who recently took over the reins. Railway Board has recognised this performance and has given the plant a target enhanced from 35000 last year to 53,000 wheels in the year 2020-21.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">There were some #bottlenecks leading to low out-turns such as a slow supply of scrap, quality of lime supply and refractory #management. Most important is that the officers and staff had got used to suboptimal performance.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">The CAO said, \u201cthe biggest challenge was to give the employees confidence. Now they are ready to enhance the target to 53,000 and most likely exceed the target.\u201d<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Earlier, #machinery and #plant such as crane, furniture, tool extraction system were not given necessary maintenance inputs since installation, he said and added the plant has taken a planned shutdown for 20 days in February-March to attend to critical machines which were never done earlier.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong><span style=\"color: #0000ff;\">The plant with 1115 employees is expected to go full steam shortly.<\/span><\/strong><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Earlier the plant was making wheels for #ICF for a long time now it has started manufacturing wagon #wheels and very soon it would produce #container wagon wheels.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">#IndianRailways, one of the largest #railroad systems in the world largely meets its requirement of wheels from its in-house factories at Bengaluru and Bela near Patna. It requires about 2 lakh cast wheels in a year.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">The #technology at Bela is the same as that of Bengaluru which is the Griffin Technology from the US which is the bottom pressure pouring technique of molten metal in graphite moulds. At its peak #capacity, the plant can produce one wheel every 2 to 3 minutes.<\/span><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1356 aligncenter\" src=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/iih28-1024x687__01__015979301398271293341.jpg?resize=640%2C412\" alt=\"\" width=\"640\" height=\"412\" srcset=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/iih28-1024x687__01__015979301398271293341.jpg?w=819&amp;ssl=1 819w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/iih28-1024x687__01__015979301398271293341.jpg?resize=300%2C193&amp;ssl=1 300w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/iih28-1024x687__01__015979301398271293341.jpg?resize=768%2C494&amp;ssl=1 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">This involves the process of making cast wheels of steel in graphite moulds. The plant makes its own moulds from graphite blocks After casting, the wheels undergo control cooling then braking.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">The wheel then goes for normalising furnaces where it is subjected to 800 centigrade for two hours. After this, the wheel is sent for rim punching which infringes high-speed water jets under the periphery of the wheels for achieving necessary hardness.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">As a strict #quality control measure, the wheels undergo #Magna flux testing under ultraviolet light in a dark room for the detection of fine cracks which are not visible in normal eyes.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">Only those wheels which have passed after quality check are permitted for despatch, he said.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">\u201cOur endeavour in the coming times will be to become a global player in the #rolling stock industry through sustain excellence and customer satisfaction, he added.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">#RailWheelPlant at Bela near Patna is the younger and more modern plant, though smaller than the other. In spite of its distance from urban and industrial centres, it has been able to keep its flag high and continues to make high-quality cast wheels.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">The #Bela_plant has received several certificates such as ISO 9001 for quality, ISO 14001 for environment management and ISO 50001 for energy management. The wheels made here go through stringent quality checks in its in house chemical and metallurgical lab which is #NABL certified.<\/span><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #993300;\">The unit also has a well-equipped health unit, emergency medical care facilities and ISO 45001 certification for occupational #safety of its employee and their families.<\/span><\/p>\n<p><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-1354 aligncenter\" src=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/iih27-1024x687__01217997983702011221.jpg?resize=640%2C449\" alt=\"\" width=\"640\" height=\"449\" srcset=\"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/iih27-1024x687__01217997983702011221.jpg?w=850&amp;ssl=1 850w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/iih27-1024x687__01217997983702011221.jpg?resize=300%2C210&amp;ssl=1 300w, https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/iih27-1024x687__01217997983702011221.jpg?resize=768%2C539&amp;ssl=1 768w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/p>\n<p style=\"text-align: justify;\"><span style=\"color: #0000ff;\">Apart from a modern automated plant, Bela boasts of a beautiful residential set up that can house over 40 officers and 500 supervisors and staff within its campus. It has a large well-equipped stadium, a staff institute and a functional central school for its residents.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Making a rapid stride, the modern Rail Wheel Plant at Bela, north Bihar has set&#8230;<\/p>\n","protected":false},"author":1,"featured_media":1353,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"koo_publish_custom_meta":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","enabled":false},"version":2}},"categories":[1],"tags":[],"class_list":["post-1352","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-main-story"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/railsamachar.com\/english\/wp-content\/uploads\/2020\/03\/IIH30-1024x687__01__01.jpg?fit=856%2C564&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1352","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1352"}],"version-history":[{"count":1,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1352\/revisions"}],"predecessor-version":[{"id":1357,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/posts\/1352\/revisions\/1357"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=\/wp\/v2\/media\/1353"}],"wp:attachment":[{"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1352"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1352"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/railsamachar.com\/english\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1352"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}